100+ datasets found
  1. New dwellings; input price indices building costs 2021=100

    • cbs.nl
    xml
    Updated Feb 28, 2025
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Centraal Bureau voor de Statistiek (2025). New dwellings; input price indices building costs 2021=100 [Dataset]. https://www.cbs.nl/en-gb/figures/detail/85728ENG
    Explore at:
    xmlAvailable download formats
    Dataset updated
    Feb 28, 2025
    Dataset provided by
    Statistics Netherlands
    Authors
    Centraal Bureau voor de Statistiek
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Area covered
    The Netherlands
    Description

    This table contains monthly figures on the input price index of new dwellings; input price indices building costs to monitor the costs of new dwellings (labour and materials) in the Netherlands.

    An input price index is determined on the basis of price changes of the various cost components making up the product - in this case a new dwelling. Changes in the prices of building equipment (tools and machinery), general costs, profit and risk are not included in the input price index. Other cost components, such as energy and transport, are also not taken into account as their influence on the final cost price is relatively modest. Land costs are also not included in the index.

    Data available from: January 2018

    Status of the figures: The price index figures for wages and the total construction costs are final until 2023. The figures for building materials are final until August 2024.

    Changes as of November 29th, 2024: Since this publication, a switch has been made to a different rounding strategy, whereby the changes are calculated on unrounded index figures and annual figures are calculated from rounded and published figures. With this switch there is more consistency with other statistics on Statline and statistics from Eurostat. As a result, mutations have changed across the entire series.

    Changes as of February 28th, 2025: Figures for January 2025 have been added.

    When will new figures be published? New figures are published about 30 days after the month under review.

  2. New dwellings; input price indices building costs 2015=100 2012-2023

    • cbs.nl
    • data.overheid.nl
    • +1more
    xml
    Updated Mar 11, 2024
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Centraal Bureau voor de Statistiek (2024). New dwellings; input price indices building costs 2015=100 2012-2023 [Dataset]. https://www.cbs.nl/en-gb/figures/detail/83887eng
    Explore at:
    xmlAvailable download formats
    Dataset updated
    Mar 11, 2024
    Dataset provided by
    Statistics Netherlands
    Authors
    Centraal Bureau voor de Statistiek
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Area covered
    The Netherlands
    Description

    This table contains monthly figures on the input price index of new dwellings; input price indices building costs to monitor the costs of new dwellings (labour and materials) in the Netherlands.

    An input price index is determined on the basis of price changes of the various cost components making up the product - in this case a new dwelling. Changes in the prices of building equipment (tools and machinery), general costs, profit and risk are not included in the input price index. Other cost components, such as energy and transport, are also not taken into account as their influence on the final cost price is relatively modest. Land costs are also not included in the index.

    Data available from: January 2012 to December 2023

    Status of the figures: The figures of the wages and total building costs are definite up to and including the year 2022. The figures of the building materials are definite up to and including six months from the most recent reported month. The data for 2023 is provisional. Since this table has been discontinued, the data is no longer finalized.

    Changes as of February 29, 2024 The index number series in this table use 2015 as the reference year (2015=100). To ensure that the results of the index series are more in line with current events, a so-called base shift is implemented once every five years. Due to the implementation of FRIBS (Framework Regulation Integrating Business Statistics) in 2021, this time the base shift is postponed by one year to 2021=100. The subsequent base shift will return to a regular year, namely 2025=100. Upon the publication of the reporting period of January 2024, such a base shift will occur, and the reference year will be switched to 2021 (2021=100). The index series with the reference 2021=100 will be published in new StatLine tables. This table will be discontinued from that moment and will no longer be updated. However, it will remain available in the archive. The new tables for 2021=100 will commence with the reporting month of January 2018.

    Changes as of March 11, 2024 This table has been discontinued. This table is followed by New dwellings; input price indices building costs 2021=100. See paragraph 3.

  3. F

    Producer Price Index by Commodity: Inputs to Industries: Net Inputs to...

    • fred.stlouisfed.org
    json
    Updated Mar 13, 2025
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    (2025). Producer Price Index by Commodity: Inputs to Industries: Net Inputs to Residential Construction, Goods [Dataset]. https://fred.stlouisfed.org/series/WPUIP2311001
    Explore at:
    jsonAvailable download formats
    Dataset updated
    Mar 13, 2025
    License

    https://fred.stlouisfed.org/legal/#copyright-public-domainhttps://fred.stlouisfed.org/legal/#copyright-public-domain

    Description

    Graph and download economic data for Producer Price Index by Commodity: Inputs to Industries: Net Inputs to Residential Construction, Goods (WPUIP2311001) from Jun 1986 to Feb 2025 about residential, construction, goods, commodities, PPI, industry, inflation, price index, indexes, price, and USA.

  4. F

    Producer Price Index by Commodity: Inputs to Industries: Net Inputs to...

    • fred.stlouisfed.org
    json
    Updated Mar 13, 2025
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    (2025). Producer Price Index by Commodity: Inputs to Industries: Net Inputs to Single Family Residential Construction, Services [Dataset]. https://fred.stlouisfed.org/series/WPUIP2311102
    Explore at:
    jsonAvailable download formats
    Dataset updated
    Mar 13, 2025
    License

    https://fred.stlouisfed.org/legal/#copyright-public-domainhttps://fred.stlouisfed.org/legal/#copyright-public-domain

    Description

    Graph and download economic data for Producer Price Index by Commodity: Inputs to Industries: Net Inputs to Single Family Residential Construction, Services (WPUIP2311102) from Dec 2014 to Feb 2025 about 1-unit structures, family, residential, construction, services, commodities, PPI, industry, inflation, price index, indexes, price, and USA.

  5. N

    Nepal Construction Input Price Index: Materials: Cement

    • ceicdata.com
    Updated Dec 15, 2024
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    CEICdata.com (2024). Nepal Construction Input Price Index: Materials: Cement [Dataset]. https://www.ceicdata.com/en/nepal/construction-input-price-index-198485100-discontinued/construction-input-price-index-materials-cement
    Explore at:
    Dataset updated
    Dec 15, 2024
    Dataset provided by
    CEICdata.com
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Time period covered
    Jul 1, 1998 - Jul 1, 2009
    Area covered
    Nepal
    Variables measured
    Producer Prices
    Description

    Nepal Construction Input Price Index: Materials: Cement data was reported at 643.800 1984-1985=100 in 2009. This records an increase from the previous number of 572.180 1984-1985=100 for 2008. Nepal Construction Input Price Index: Materials: Cement data is updated yearly, averaging 323.408 1984-1985=100 from Jul 1994 (Median) to 2009, with 16 observations. The data reached an all-time high of 643.800 1984-1985=100 in 2009 and a record low of 225.993 1984-1985=100 in 1994. Nepal Construction Input Price Index: Materials: Cement data remains active status in CEIC and is reported by Central Bureau of Statistics. The data is categorized under Global Database’s Nepal – Table NP.EA008: Construction Input Price Index: 1984-85=100 (Discontinued).

  6. L

    Lithuania Construction Input Price Index

    • ceicdata.com
    Updated Jan 15, 2025
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    CEICdata.com (2025). Lithuania Construction Input Price Index [Dataset]. https://www.ceicdata.com/en/lithuania/construction-input-price-index-2010100/construction-input-price-index
    Explore at:
    Dataset updated
    Jan 15, 2025
    Dataset provided by
    CEICdata.com
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Time period covered
    Jan 1, 2017 - Dec 1, 2017
    Area covered
    Lithuania
    Variables measured
    Producer Prices
    Description

    Lithuania Construction Input Price Index data was reported at 124.024 2010=100 in Dec 2017. This records an increase from the previous number of 123.468 2010=100 for Nov 2017. Lithuania Construction Input Price Index data is updated monthly, averaging 103.008 2010=100 from Jan 2000 (Median) to Dec 2017, with 216 observations. The data reached an all-time high of 124.024 2010=100 in Dec 2017 and a record low of 72.407 2010=100 in Jan 2002. Lithuania Construction Input Price Index data remains active status in CEIC and is reported by Statistics Lithuania. The data is categorized under Global Database’s Lithuania – Table LT.I016: Construction Input Price Index: 2010=100. Rebased from 2010=100 to 2015=100 Replacement series ID: 400954237

  7. D

    Civil engineering works; input price index 2000 = 100, from 1979

    • dexes.eu
    • cbs.nl
    • +1more
    atom, json
    Updated Mar 12, 2025
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Centraal Bureau voor de Statistiek (2025). Civil engineering works; input price index 2000 = 100, from 1979 [Dataset]. https://dexes.eu/en/dataset/civil-engineering-works-input-price-index-2000-100-from-1979
    Explore at:
    atom, jsonAvailable download formats
    Dataset updated
    Mar 12, 2025
    Dataset authored and provided by
    Centraal Bureau voor de Statistiek
    License

    https://opendata.cbs.nl/ODataApi/OData/81139enghttps://opendata.cbs.nl/ODataApi/OData/81139eng

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Description

    The historical series 'Civil engineering; input price index 2000=100, since 1979' represents the trend of the costs of labour, material and equipment involved in projects in various areas of civil engineering (in Dutch: Grond-, Weg- en Waterbouw (GWW)) in the Netherlands. This series was created by linking independently calculated series from the past. At this moment, there are eight areas within civil engineering. These areas are based on the standard Classification Products to Activity (CPA). There is also one area of which the observation has stopped. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed.. The price index for the total of civil engineering is a weighted average of the eight areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account. Changes in excise duties (such as that of diesel, used in civil engineering works, from 1/1/2013) are also not reflected in the price indices. Changes compared with twelve months previously are also published for all indices. Data available from: The various series of price indices of Civil Engineering cover different periods. Some start in 1979, while others start at the shift to 2000=100. For each series, the period for which it contains figures is given below: - Constructions for fluids: February 1979 - Road construction: February 1979 - Road maintenance: February 1979; discontinued from October 2004 - Site preparation works: February 1979 - Constructions and construction works for utility projects for fluids Januari 1979 - Civil engineering works: January 2000 - Bridges and tunnels: January 2000 - Railways and underground railways: January 2000 - Constructions for water projects: January 2000 - Electrical installation works: January 2000 Status of the figures: Index figures up to 2023 are definite. Other index figures are provisional. The period the price indices remain provisional depends on the moment that the collectively negotiated (CAO) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review. Changes as of February 28th 2025: The figures for January 2025 are added to the table. Also all the individual months from January 2024 were added to the table. This is due to an updated method with the new base year 2020=100. Changes as of March 3th 2025: Figures were not put in the correct columns due to an error in the source file. This has now been corrected. When will new figures be published? Provisional figures for February, March and April 2025 will be published at the end of May 2025.

  8. I

    Israel Road Construction Input Price Index: ME: CC: Portland

    • ceicdata.com
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    CEICdata.com, Israel Road Construction Input Price Index: ME: CC: Portland [Dataset]. https://www.ceicdata.com/en/israel/road-construction-input-price-index-jan2010100/road-construction-input-price-index-me-cc-portland
    Explore at:
    Dataset provided by
    CEICdata.com
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Time period covered
    Apr 1, 2017 - Mar 1, 2018
    Area covered
    Israel
    Variables measured
    Producer Prices
    Description

    Israel Road Construction Input Price Index: ME: CC: Portland data was reported at 92.400 Jan2010=100 in Oct 2018. This stayed constant from the previous number of 92.400 Jan2010=100 for Sep 2018. Israel Road Construction Input Price Index: ME: CC: Portland data is updated monthly, averaging 70.900 Jan2010=100 from Jan 1983 (Median) to Oct 2018, with 430 observations. The data reached an all-time high of 102.300 Jan2010=100 in Jul 2013 and a record low of 0.700 Jan2010=100 in Feb 1983. Israel Road Construction Input Price Index: ME: CC: Portland data remains active status in CEIC and is reported by Central Bureau of Statistics. The data is categorized under Global Database’s Israel – Table IL.I022: Road Construction Input Price Index: Jan2010=100.

  9. Monthly office building input price index in Israel 2023-2024

    • statista.com
    Updated Jul 22, 2024
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Statista (2024). Monthly office building input price index in Israel 2023-2024 [Dataset]. https://www.statista.com/statistics/1472110/israel-office-construction-input-price-index/
    Explore at:
    Dataset updated
    Jul 22, 2024
    Dataset authored and provided by
    Statistahttp://statista.com/
    Area covered
    Israel
    Description

    In March 2024, the input price index for office buildings in Israel amounted to around 127 points. The price of inputs for office construction in the country increased on average between January 2023 and March 2024.

  10. Monthly residential building input price index in Israel 2023-2024

    • statista.com
    Updated Aug 5, 2024
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Monthly residential building input price index in Israel 2023-2024 [Dataset]. https://www.statista.com/statistics/1472085/israel-residential-construction-input-price-index/
    Explore at:
    Dataset updated
    Aug 5, 2024
    Dataset authored and provided by
    Statistahttp://statista.com/
    Area covered
    Israel
    Description

    In March 2024, the input price index for residential building in Israel amounted to around 130 points. The price of inputs for residential construction in the country persistently increased throughout 2023 and into 2024.

  11. Construction industry's energy inputs price index in the U.S. 1997-2020

    • statista.com
    Updated Aug 25, 2023
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Statista (2023). Construction industry's energy inputs price index in the U.S. 1997-2020 [Dataset]. https://www.statista.com/statistics/197769/energy-inputs-price-index-for-the-us-construction-industry-since-1997/
    Explore at:
    Dataset updated
    Aug 25, 2023
    Dataset authored and provided by
    Statistahttp://statista.com/
    Area covered
    United States
    Description

    The price index of energy inputs by the construction industry in the U.S. has fluctuated over the years. In 2020, the price index for this industry stood at around 66.6, compared with 100 in 2012.

  12. I

    Israel Road Construction Input Price Index: Miscellaneous: Office...

    • ceicdata.com
    Updated Dec 15, 2022
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    CEICdata.com (2022). Israel Road Construction Input Price Index: Miscellaneous: Office Maintenance [Dataset]. https://www.ceicdata.com/en/israel/road-construction-input-price-index-jan1996100/road-construction-input-price-index-miscellaneous-office-maintenance
    Explore at:
    Dataset updated
    Dec 15, 2022
    Dataset provided by
    CEICdata.com
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Time period covered
    Feb 1, 2009 - Jan 1, 2010
    Area covered
    Israel
    Variables measured
    Producer Prices
    Description

    Israel Road Construction Input Price Index: Miscellaneous: Office Maintenance data was reported at 156.800 Jan1996=100 in Jan 2010. This records an increase from the previous number of 155.800 Jan1996=100 for Dec 2009. Israel Road Construction Input Price Index: Miscellaneous: Office Maintenance data is updated monthly, averaging 132.600 Jan1996=100 from Jan 1996 (Median) to Jan 2010, with 169 observations. The data reached an all-time high of 156.900 Jan1996=100 in Nov 2009 and a record low of 100.000 Jan1996=100 in Jan 1996. Israel Road Construction Input Price Index: Miscellaneous: Office Maintenance data remains active status in CEIC and is reported by Central Bureau of Statistics. The data is categorized under Global Database’s Israel – Table IL.I023: Road Construction Input Price Index: Jan1996=100.

  13. F

    Producer Price Index by Commodity: Inputs to Industries: Net Inputs to...

    • fred.stlouisfed.org
    json
    Updated Mar 13, 2025
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    (2025). Producer Price Index by Commodity: Inputs to Industries: Net Inputs to Single Family Residential Construction, Excluding Capital Investment, Labor, and Imports [Dataset]. https://fred.stlouisfed.org/series/WPUIP231110
    Explore at:
    jsonAvailable download formats
    Dataset updated
    Mar 13, 2025
    License

    https://fred.stlouisfed.org/legal/#copyright-public-domainhttps://fred.stlouisfed.org/legal/#copyright-public-domain

    Description

    Graph and download economic data for Producer Price Index by Commodity: Inputs to Industries: Net Inputs to Single Family Residential Construction, Excluding Capital Investment, Labor, and Imports (WPUIP231110) from Dec 2014 to Feb 2025 about 1-unit structures, imports, capital, investment, family, residential, construction, labor, commodities, PPI, industry, inflation, price index, indexes, price, and USA.

  14. Construction output price indices

    • ons.gov.uk
    • cy.ons.gov.uk
    xlsx
    Updated Feb 13, 2025
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Office for National Statistics (2025). Construction output price indices [Dataset]. https://www.ons.gov.uk/businessindustryandtrade/constructionindustry/datasets/interimconstructionoutputpriceindices
    Explore at:
    xlsxAvailable download formats
    Dataset updated
    Feb 13, 2025
    Dataset provided by
    Office for National Statisticshttp://www.ons.gov.uk/
    License

    Open Government Licence 3.0http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/
    License information was derived automatically

    Description

    Construction Output Price Indices (OPIs) from January 2014 to December 2024, UK. Summary.

  15. New dwellings; input price indices building costs 2010=100 2008-2018

    • cbs.nl
    • ckan.mobidatalab.eu
    • +2more
    xml
    Updated May 2, 2018
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Centraal Bureau voor de Statistiek (2018). New dwellings; input price indices building costs 2010=100 2008-2018 [Dataset]. https://www.cbs.nl/en-gb/figures/detail/81911ENG
    Explore at:
    xmlAvailable download formats
    Dataset updated
    May 2, 2018
    Dataset provided by
    Statistics Netherlands
    Authors
    Centraal Bureau voor de Statistiek
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Area covered
    The Netherlands
    Description

    Statistics Netherlands calculates monthly the series New dwellings; input price indices building costs to monitor the costs of new dwellings (labour and materials) in the Netherlands. An input price index is determined on the basis of price changes of the various cost components making up the product - in this case a new dwelling. Changes in the prices of building equipment (tools and machinery), general costs, profit and risk are not included in the input price index. Other cost components, such as energy and transport, are also not taken into account as their influence on the final cost price is relatively modest. Land costs are also not included in the index.

    Data available from: January 2008 t/m January 2018

    Status of the figures: The figures for total building costs and the wages are definite until 2016. The figures of Building materials are definite until August 2017. The period the price indices remain provisional depends on the moment that the collectively negotiated (CAO) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review. Since this table has been stopped, the data is no longer made definitive.

    Changes as of April 30, 2018: None, this table has been discontinued.

    When will new figures be published? Not applicable anymore. This table is followed by the table New dwellings; input price indices building costs 2015=100. See section 3

  16. Input producer price index of construction services in Vietnam 2015-2023

    • statista.com
    Updated Feb 6, 2021
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Statista (2021). Input producer price index of construction services in Vietnam 2015-2023 [Dataset]. https://www.statista.com/statistics/1086428/vietnam-input-producer-price-index-construction-services/
    Explore at:
    Dataset updated
    Feb 6, 2021
    Dataset authored and provided by
    Statistahttp://statista.com/
    Area covered
    Vietnam
    Description

    In 2023, the input producer price index of construction services in Vietnam amounted to approximately 129.84 index points, indicating an increase from the previous year. In that year, the country's input producer price index was at 120.11 points.

  17. e

    New-build homes; input price index construction costs 2010=100 2008-2018

    • data.europa.eu
    atom feed, json
    Updated Jul 23, 2024
    + more versions
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    (2024). New-build homes; input price index construction costs 2010=100 2008-2018 [Dataset]. https://data.europa.eu/data/datasets/2146-nieuwbouwwoningen-inputprijsindex-bouwkosten-2010-100-2008-2018?locale=en
    Explore at:
    atom feed, jsonAvailable download formats
    Dataset updated
    Jul 23, 2024
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Description

    Every month, CBS calculates the series of Nieuwbouwwoningen; input price index construction costs. This shows the development of the costs (wage and material) involved in the construction of new homes in the Netherlands. An input price index is determined on the basis of the price developments of the different cost components from which the product to be realised — in this case a new home — is built. In the composition of this index, changes in the prices of equipment (tools and machines), general costs and ‘profit and risk’ are excluded. Costs for energy and transport are also not included in the calculation because their impact on the final cost is relatively small. The price evolution of land costs is also not included in this input price index.

    Data available from: January 08 until January 2018

    Status of the figures: The input price index of the labour component and the total construction costs are final until 2016. The material component is final until August 2017. The period during which the price indices are provisional depends on the closing of the collective agreements involved in the Input. This period can range from 4 to approximately 16 months after the period for which the figures are calculated. Since this table has been discontinued, the data will no longer be finalised.

    Changes as of 7 April 2021 None, this table has been discontinued.

    When are new figures coming? No longer applicable. This table is followed up by the table Nieuwbouwwoningen; input price index construction costs 2015=100. See paragraph 3

  18. Monthly road construction input price index in Israel 2023-2024

    • statista.com
    Updated Oct 22, 2024
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    Statista (2024). Monthly road construction input price index in Israel 2023-2024 [Dataset]. https://www.statista.com/statistics/1472112/israel-road-construction-input-price-index/
    Explore at:
    Dataset updated
    Oct 22, 2024
    Dataset authored and provided by
    Statistahttp://statista.com/
    Area covered
    Israel
    Description

    In March 2024, the input price index for road construction in Israel reached around 141 points. The price of inputs for road construction in the country fluctuated between January 2023 and March 2024.

  19. T

    Romania - Construction cost index: Input prices for materials

    • tradingeconomics.com
    csv, excel, json, xml
    Updated Sep 4, 2020
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    TRADING ECONOMICS (2020). Romania - Construction cost index: Input prices for materials [Dataset]. https://tradingeconomics.com/romania/construction-cost-idx-input-prices-for-materials-eurostat-data.html
    Explore at:
    xml, csv, json, excelAvailable download formats
    Dataset updated
    Sep 4, 2020
    Dataset authored and provided by
    TRADING ECONOMICS
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Time period covered
    Jan 1, 1976 - Dec 31, 2025
    Area covered
    Romania
    Description

    Romania - Construction cost index: Input prices for materials was RON109.70 points in December of 2020, according to the EUROSTAT. Trading Economics provides the current actual value, an historical data chart and related indicators for Romania - Construction cost index: Input prices for materials - last updated from the EUROSTAT on March of 2025. Historically, Romania - Construction cost index: Input prices for materials reached a record high of RON130.70 points in June of 2012 and a record low of RON19.20 points in March of 2000.

  20. I

    Israel Residential Building Input Price Index: Materials and Products

    • ceicdata.com
    Updated Feb 15, 2025
    Share
    FacebookFacebook
    TwitterTwitter
    Email
    Click to copy link
    Link copied
    Close
    Cite
    CEICdata.com (2025). Israel Residential Building Input Price Index: Materials and Products [Dataset]. https://www.ceicdata.com/en/israel/residential-building-input-price-index-jul2011100/residential-building-input-price-index-materials-and-products
    Explore at:
    Dataset updated
    Feb 15, 2025
    Dataset provided by
    CEICdata.com
    License

    Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
    License information was derived automatically

    Time period covered
    Apr 1, 2017 - Mar 1, 2018
    Area covered
    Israel
    Variables measured
    Producer Prices
    Description

    Israel Residential Building Input Price Index: Materials and Products data was reported at 106.800 Jul2011=100 in Jun 2018. This stayed constant from the previous number of 106.800 Jul2011=100 for May 2018. Israel Residential Building Input Price Index: Materials and Products data is updated monthly, averaging 61.568 Jul2011=100 from Nov 1983 (Median) to Jun 2018, with 416 observations. The data reached an all-time high of 106.900 Jul2011=100 in Apr 2018 and a record low of 1.024 Jul2011=100 in Nov 1983. Israel Residential Building Input Price Index: Materials and Products data remains active status in CEIC and is reported by Central Bureau of Statistics. The data is categorized under Global Database’s Israel – Table IL.I020: Residential Building Input Price Index: Jul2011=100.

Share
FacebookFacebook
TwitterTwitter
Email
Click to copy link
Link copied
Close
Cite
Centraal Bureau voor de Statistiek (2025). New dwellings; input price indices building costs 2021=100 [Dataset]. https://www.cbs.nl/en-gb/figures/detail/85728ENG
Organization logo

New dwellings; input price indices building costs 2021=100

Explore at:
xmlAvailable download formats
Dataset updated
Feb 28, 2025
Dataset provided by
Statistics Netherlands
Authors
Centraal Bureau voor de Statistiek
License

Attribution 4.0 (CC BY 4.0)https://creativecommons.org/licenses/by/4.0/
License information was derived automatically

Area covered
The Netherlands
Description

This table contains monthly figures on the input price index of new dwellings; input price indices building costs to monitor the costs of new dwellings (labour and materials) in the Netherlands.

An input price index is determined on the basis of price changes of the various cost components making up the product - in this case a new dwelling. Changes in the prices of building equipment (tools and machinery), general costs, profit and risk are not included in the input price index. Other cost components, such as energy and transport, are also not taken into account as their influence on the final cost price is relatively modest. Land costs are also not included in the index.

Data available from: January 2018

Status of the figures: The price index figures for wages and the total construction costs are final until 2023. The figures for building materials are final until August 2024.

Changes as of November 29th, 2024: Since this publication, a switch has been made to a different rounding strategy, whereby the changes are calculated on unrounded index figures and annual figures are calculated from rounded and published figures. With this switch there is more consistency with other statistics on Statline and statistics from Eurostat. As a result, mutations have changed across the entire series.

Changes as of February 28th, 2025: Figures for January 2025 have been added.

When will new figures be published? New figures are published about 30 days after the month under review.

Search
Clear search
Close search
Google apps
Main menu